Initial Entry

Just moved into the house, just cleaning and getting it sorted so I can leave it for a little while until I finish the other renovation.  I did tear out the cabinets in the garage, and install some temporary lights.  Did find that there are 2 load bearing posts in those cabinet walls, so those will have to remain, but I can work around that.





Most of the work is sealing all the air gaps, entry points for rodents, and any other glaring issues.  Major fixes include:
  • Caulked all window gaps
  • Changed locks
  • Fixed minor leak in the Master Bedroom sink drain
  • Filled all holes and gaps with rockwool or foam
  • Added door and bottom seals to the garage doors
  • Fixed the 2nd garage door opener
  • Removed screens
  • Removed satellite dish
  • Filled low-level cracks in the exterior with sanded caulk, will do the rest later when I have a ladder
  • Balanced heat registers to more evenly heat the home from floor to floor
  • Replaced rear outdoor light with a better fixture rather than the generic flood light
  • Started removing any plants that are close to the house
  • Removed loose stair railing
Unfortunately the cable company is slow getting the new cable buried so I likely won't have permanent internet setup in time to install the timers, cameras, and thermostat before I leave.


Comments

Popular posts from this blog

Front Windows and Deck Ledger

 Finally getting started on the front basement windows.  Will also be installing the ledger for the front deck, so some extra demo of the stucco was required.  My temporary vent cover stucco was a little harder to remove, so I haven't done it yet in these pictures.

Basement Bedroom Window

 Finally getting the first new window installed in the basement bedroom.  There was some wood rot under it, so I had to replace that wood, and update the sheathing.  Ran out of sealing tape so it's only partly done in the last picture.

Revised Prototype

 Playing with paint to make the bookshelf a little more dramatic and separate it more from the upper wall. Ignore the water stain, washing machine delivery. Looks good so far.  If I continue to like it I'll make a more permanent shelf later when it's time to finish the house.  I used scrap for this one, so the top will obviously go all the way to the far wall, and I'll integrate it with the bricks better.