Out for a short visit to install monitoring systems. Doing some discovery demo. Pulled up the carpet in the kitchen to reveal 3/4 ply was used in the kitchen, but 1/2" chip board was using in the rest of the living area.
Also removed some of the side wall in the kitchen. Confirmed that the drywall area over the cabinets is empty, and was just done for looks, so I can remove it when it's time to do the kitchen.
Also got a proper toilet to install. The current toilets in the house as super small. This is a proper comfort height and elongated toilet. Also dual flush.
Finally, started pulling up more carpet on the stairs. Turns out they rounded off the steps. I plan to add 1" of length to each step, but seeing that the current steps are rounded means I'll need to replace the treads entirely. This is actually not a big deal, and will make the steps more secure in the long run.
Comments
Post a Comment