Got some of the front rock dug up, and temporary pavers in place showing where the raised, planted area will be. Making sure it still allows for RV access.
Also removed a decayed stucco "nub" that was on the side of the house. It was added after the house was stucco'd and wasn't worth keeping.
Old garage doors/openers had issues. No remote for one, iffy remote connection for the others, and very noisy and bumpy. Doors themselves were ok, but put new rollers in, and found a good deal on modern 3/4 hp garage door openers. Got one installed.
Knew there was some empty space under the stairs, good use of space for long-term storage. Could put a door on it but probably doesn't need it since that is all in a closet already. I'll reinforce the upper beam and remove the 2 studs.
Removing the drywall and trim around the windows so that I can measure for replacements. Also cut the drywall around the water plumbing that was exposed in the basement. Discovered it was just really, really lazy plumbing. They moved the exterior faucet and didn't bother to replumb correctly.